Home Services Who We Help Packages Heist Labs Resources Answers Case Studies About Craig Blog Let's Talk Contact
(423) 482-8886 Let's Connect →
Blog · Local SEO

Citation cleanup before citation building

Most contractors have 30+ duplicate or wrong citations dragging down their NAP consistency. Clean before you build.

Most contractors have 30+ duplicate or wrong citations dragging down their NAP consistency. Clean before you build.

The short answer

If you came here for the TL;DR — here it is in one paragraph: Most contractors have 30+ duplicate or wrong citations dragging down their NAP consistency. Clean before you build. The longer version below has the framework, the math, and the specific moves we make on Heist client work.

Why it matters

Most contractors lose money on the topic of this post for the same reason: they've been told something true-but-incomplete by someone trying to sell them. The full picture changes the calculus. We see this play out every month in Monthly Momentum Meetings — the moment a contractor sees the real numbers, the strategy shifts.

How we do it on Heist client work

  1. Audit first. We don't recommend changes before we understand the baseline.
  2. Pick one lever. Most contractors try to fix five things at once and move none of them.
  3. Ship the change. 2 weeks max from "we should" to "it's live."
  4. Measure for 30 days. Then decide if it stays, expands, or gets reverted.

What this isn't

This post isn't a 5,000-word "ultimate guide" SEO-bait. We don't need to pretend a topic is more complicated than it is. If you have a specific question, book a call — we'll answer in 15 minutes.

Related

The Heist Way

Ready to plant your flag?

15-minute call. No pitch deck. No pressure.